Tuesday 19 January 2010

Starting Filming =/

With the deadline for the first draft to be handed in with the next week i need to capture all my video footage. As I have chosen to have two films running side by side this means that i have to edit and capture two videos which is double the work. This complicated idea could see me falling behind. The snow has been a real problem as the school has had snow days on which it is closed also with the snow on the floor it means that continuity would not match as half way through the film it would all disappear which would not look professional.